Guardrails & Walkways Offer Safe Access for University Maintenance Workers


Kee Safety was tasked with designing a comprehensive rooftop safety plan for the University of Toronto. They were in need of a solution that offered workers safe movement throughout the roof, along with fall protection along the roof perimeter.

University Of Toronto (2) Kee Walk
The Kee Walk with guardrail system is a fall protection solution consisting of walkway and guardrail which can be installed quickly and easily on a wide variety of roofs.

Background

Kee Safety, Ltd. was contacted to support the University of Toronto with roof top safety products and systems. After a site survey was performed, our technical team designed a system that worked best for the clients rooftop safety needs.

University Of Toronto (15)
Kee Guard Contractor is versatile, easy to assemble, and gives you an innovative approach to durable portable railing systems for roofs up to a 5 degree pitch.

Delivering Value

The client was delighted that we could provide our Kee Guard Contractor edge protection system, Kee Walk for the roof top walkway system while also providing a Safe Access platforms system around the facility rooftop. Having a wide product offering and working with a sole provider: Kee Safety, Ltd., was a benefit to our installation partner and the engineering firm who designed the project.




Kee Walk with Guardrail – Non-Penetrating Rooftop Fall Protection System / Kee Safety Rooftop Guardrail System – Fall Protection Solution

Walkways that go Above and Beyond

Kee Walk® provides a safe, anti-slip, level walkway for workers who need to access a roof in the course of their work. Its intelligent design protects the roof surface from unnecessary damage and integrates easily with either guardrails or lifeline systems.

Kee Walk w Guardrail

How We Access Risk

As fall protection experts, we can perform a critical analysis on your rooftop to identify the hazards where your workers are exposed to the greatest risk. This ensures that the most dangerous areas are protected immediately with state-of-the-art systems and OH&S compliant solutions.